Plano · serving Collin County & North Dallas Mon-Fri 7:00 am - 6:00 pm · Saturday 8:00 am - 2:00 pm (469) 555-0148
KeystoneFence & Deck Co.
Projects

What our jobs look like

From a single walk gate to a 1,600-foot pasture fence: the scope, the specs and how long each kind of job typically takes.

About these projectsThese are typical scopes for the work we do: what each kind of job involves and the specs that drive the estimate. They are representative, not records of specific jobs.

Elevation of a 8-foot board-on-board cedar privacy fence with steel posts
F-01 · Fencing

Alley fence replacement on steel posts

Plano, alley-loaded lot · Homeowner

An original 1990s fence leaning along the alley: torn out, re-posted in steel and rebuilt in cedar with a double gate for bins.

  • Length140 LF
  • Height8'-0"
  • StyleBoard-on-board cedar, cap and trim
  • PostsGalvanized steel
  • Gates1 walk, 1 double
  • Typical duration3 days
Elevation of a modern horizontal cedar slat fence with black steel posts
F-02 · Fencing

Modern horizontal front screen

Frisco, corner lot · Homeowner

A street-facing screen for a corner lot, with a matching gate and the cedar sealed on day one.

  • Length64 LF
  • Height6'-0"
  • Style1x6 cedar, 3/8" gap
  • Posts2x2 black steel
  • Gates1 walk
  • Typical duration2 days
Elevation of a 4-foot pool barrier fence with a self-closing, self-latching gate
F-05 · Fencing

Pool barrier for a new pool

Prosper, new construction · Homeowner + pool builder

Barrier scheduled ahead of the final pool inspection, with posts grouted into the new deck.

  • Length180 LF
  • Height5'-0"
  • StylePowder-coated aluminum
  • Gates2 self-closing, self-latching
  • PostsCore-drilled into deck
  • Typical duration2 days
Elevation of a 5-foot ornamental steel fence with spear-top pickets
F-03 · Fencing

HOA common-area perimeter

McKinney, master-planned community · HOA / property manager

A long run along a greenbelt, racked to follow the slope and phased so the trail stayed open.

  • Length900 LF
  • Height6'-0"
  • StyleOrnamental steel, racked on slope
  • PaperworkCOI and completion photos
  • PhasingAround resident access
  • Typical duration6 days
Elevation of a pipe ranch fence with welded wire and an H-brace corner
F-04 · Fencing

Pasture pipe fence with H-braces

Collin County acreage · Landowner

Fencing for horses on acreage, laid out from survey pins with braced corners at every turn.

  • Length1,600 LF
  • Height4'-6"
  • Style3-rail welded pipe + welded wire
  • Corners4 H-braces
  • Gates1 ranch gate
  • Typical duration8 days
Elevation of an arched double-swing steel driveway gate between masonry piers
G-01 · Gates

Arched drive gate with solar operator

Prosper, long driveway · Homeowner

An entrance gate far from power, run on solar, with a keypad set at driver's-window height.

  • Opening16'-0"
  • GateDouble-swing steel, arched
  • OperatorSolar with battery backup
  • AccessKeypad on gooseneck
  • SafetyPhoto eyes
  • Typical duration3 days
Elevation of a gated entry with a keypad pedestal, photo eyes and intercom
G-04 · Gates

HOA entrance access upgrade

Allen, neighborhood entrance · HOA

An aging keypad replaced with a multi-user cellular intercom that the board can manage from a phone.

  • ScopeKeypad to cellular intercom
  • UsersMulti-unit codes
  • ExitVehicle exit loop
  • SafetyPhoto eyes replaced
  • TrainingBoard and manager
  • Typical duration2 days
White wooden double gate with diagonal boards set in a black steel frame at a residential entrance
G-05 · Gates

Sagging side gate rebuilt on steel

Richardson, side yard · Homeowner

A gate that hadn't latched in a year, rebuilt on a steel frame using the original boards.

  • Gate4'-0" walk gate
  • FixRebuilt on welded steel frame
  • PostHinge post reset in concrete
  • HardwareNew hinges and latch
  • BoardsExisting cedar reused
  • Typical duration1 day
Side elevation of a wood deck with railing, beam, posts, footings and stairs
D-01 · Decks

Raised cedar deck with stairs

Allen, sloped backyard · Homeowner

A deck stepping off the back door over a falling yard, permitted and inspected.

  • Size16' x 20' (320 sq ft)
  • Height3'-0" above grade
  • DeckingCedar
  • Guard36" cedar railing
  • Stairs4 risers
  • Typical duration8 days
Front elevation of a cedar pergola with beams, rafters and purlins
D-03 · Decks

Pergola over a composite deck

Frisco, west-facing yard · Homeowner

Afternoon shade for a west-facing yard, with a lighter composite color chosen to stay cooler.

  • Deck12' x 14' capped composite
  • Pergola12' x 12' cedar
  • ShadeTight purlin spacing
  • FootingsConcrete piers
  • ExtrasFan and light prep
  • Typical duration7 days
Elevation of a storm-damaged fence section leaning under wind load
R-02 · Repair

Storm rebuild after straight-line winds

Richardson, mature trees · Homeowner (insurance claim)

A yard with dogs secured the same day, then rebuilt on steel posts once the claim was approved.

  • Section48 LF
  • Posts6 replaced in steel
  • BoardsMatched cedar
  • DocsDated photos and written scope
  • SecuringSame-day temporary panels
  • Typical duration1 + 2 days
Section through a steel fence post set in a concrete footing in expansive clay soil
R-04 · Repair

Re-post and stain instead of replace

Plano, original fence · Homeowner

Sound boards on rotted posts: re-posted in steel and stained, for far less than a new fence.

  • Posts22 replaced in steel
  • BoardsExisting, re-fastened
  • StainSemi-transparent, both sides
  • Length210 LF
  • SavedThe boards
  • Typical duration3 days
Compact track loader parked at the edge of cut brush in an autumn hardwood stand
L-05 · Clearing

Forestry mulching on overgrown acreage

McKinney, 5 acres · Landowner

A pasture lost to privet and cedar opened back up, with the mature oaks and pecans flagged and left standing.

  • Area5 acres
  • VegetationPrivet, cedar, saplings
  • Keepers14 oaks and pecans flagged
  • MethodMulched in place
  • BurningNone
  • Typical duration4 days
Brown horse leaning over a steel pipe-rail fence in a sunny Texas pasture
L-04 · Clearing

Fence line cleared, then fenced

Prosper area, acreage · Landowner

A buried boundary cleared, the old wire pulled, and a new pipe fence built on the line by the same crew.

  • Line2,400 LF
  • Strip12 ft cleared
  • Old fenceWire and T-posts pulled
  • PinsLocated from survey
  • ThenPipe fence, same crew
  • Typical duration3 + 6 days
Excavator beside a freshly graded backyard behind a brick home, with form stakes set near the patio
L-06 · Clearing

Backyard regrade before a deck

Allen, water toward the house · Homeowner

Water pooling at the slab corrected with a regrade, and a level pad left ready for the new deck.

  • Area1,100 sq ft
  • Fall6 in. in the first 10 ft
  • FillCompacted in lifts
  • PadDeck area leveled
  • FinishReady for sod
  • Typical duration2 days
Free on-site estimate

Have a project like one of these?

Tell us about the project and we'll schedule a visit. You'll get an itemized written estimate, with no prices guessed online and no pressure.

Free estimate

Or call

(469) 555-0148
CallFree estimate